Vermillion Repeater at new site 2015

ver4 ver2 ver3 ver1On Tuesday July 7th 2015 Vermillion .375 went on the air.  All the tower work at Vermillion was done by Ed W0SD.  The ground crew for the two work days were AD0P and AD0ED.

On Monday July 27th Fred WA0GMH, Matt AD0P and Ed W0SD installed Fred’s Link controller and linked the Vermillion Repeater into the PDARC Two Meter System.  This now completes the PDARC Two Meter System with linked sites at Norwegian Hill, Yankton and Vermillion,